The problem is rarely the equipment. It is the integration.
A machine can meet its specification and still not work in your plant, because nobody resolved how it connects to what is already installed: the existing control system, material flow, safety, utilities. That intermediate layer is what gets underestimated at budgeting time and what delays start-up afterwards.
What it covers
- Integration of new equipment with the existing installation
- Electrical and mechanical design, basic and detail engineering
- Planning of the project and of the shutdowns it requires
- Start-up through to production conditions
- Management of specialist labour during execution
- FAT testing at origin, before shipment
Why FAT testing decides the schedule
A factory acceptance test is the last opportunity to find a problem while fixing it is still cheap and costs none of your plant's time. Catching at FAT what you would otherwise catch on your own floor changes the conversation entirely: at origin it is a correction; on your line it is a stoppage.
The cycle closes with SAT testing and commissioning on site, once the equipment is installed.