Store · Packages

Packages: scanner, process, supplies and workstation

A scanner with no process, nobody who knows how to run it and no machine able to open the files is not a capability. It is an invoice.

Request a package quote on WhatsApp See selection criteria

Why the package exists

When preparing a package, we check three things: training with real parts, computer capacity to process the data and availability of supplies. Addressing them in the quote helps bring the equipment into daily work.

The package exists so that none of the three falls outside the scope by oversight.

What is included

Three configurations, by what you need to solve

We do not split them by tier or by price, because the most expensive unit is not the best one for every part. We split them by the problem:

What is not included

We say this upfront rather than in the small print: it does not include third-party CAD licences, it does not include building work or space conditioning, and it does not include staff. If the plant has nobody to train, the package does not solve the problem, and we would rather say so before quoting.

How it is quoted

There is no published price list because there is no standard package: it depends on your parts, your tolerance and your volume. Tell us what you need to solve and we propose a configuration and a price, with an invoice. If what you need does not justify the purchase, we say so and point you at the service instead.

Can I drop the training to bring the price down?

You can, but it is the most expensive cut available. Training costs a fraction of the equipment, and it is the only thing that guarantees the equipment gets used. If you already have experienced staff, that is a different conversation.

Is financing or leasing available?

It can be structured case by case. Many mid-sized companies resolve this kind of purchase through leasing because they have no capital budget line; we review it at quotation.

What if the equipment turns out to be the wrong choice?

It is far less likely when the configuration is defined from your parts rather than from a catalogue, which is exactly why we open by asking about the part. Warranty scope and conditions are set out in writing in the quotation.

How long is delivery?

It depends on the equipment and on whether it is in stock or has to be imported. The date is confirmed in the quotation, not afterwards.

Does it suit a company with no engineering department?

That is precisely the case it is designed for. What you need is somebody to train who will use it regularly; they do not need to be an engineer.

Can I start with training and buy later?

It is a sequence we often recommend. You train on our equipment, decide with your hands, and buy knowing exactly what you need.

Packages

Which parts do you need to stop sending out?

WhatsApp 22 18 36 64 37 Contact